NRC 2026

NRC 2025 · Ranking analysis · Analisis kedudukan

📊 RoboMission Rookie (Lower) · Kelantan

What the numbers from KELANTAN actually say: score vs time, round-to-round improvement, and why the fastest robot is not always the winning robot.

Data snapshot: 17 Sep 2025 15:48:11 · source: nrc.sasbadi.com
Full results →
Teams
8
Kelantan
Median score
81.5
top score 146
Used the full 120 s
0
of 8 robots
Rounds
2
best one counts

Score vs Time — is faster better?

Every dot is one team's best run: how many points it scored (↑) and how long it took (→). A scatter plot is the right form here because both values are continuous and the question is about their relationship.

+0.83
Correlation r · all 8 teams
very strong positive — higher scores take longer · small sample
teams trend, finishers only
How to read it: every robot finished inside the clock. Across all teams the relationship is very strong positive — higher scores take longer. Speed alone wins nothing — mission points do.

⏱️ Best time ≠ best ranking

Ranking rule: teams are sorted by score first; equal scores go to the higher total of all rounds, then to the faster time.

🥇 The fastest robot — I13, done in 22.78 s — finished rank #7 of 8 with 34 points. The #1 team (I17) took 99.81 s — 4.4× as long — but scored 146.

No place in the top 10 was decided between equal scores.

Fastest 5Time (s)ScoreActual rank
I13 22.78 34 #7 / 8
I07 48.03 30 #8 / 8
I14 70.60 49 #6 / 8
I16 77.46 94 #3 / 8
I08 82.79 79 #5 / 8

Round by round — who improved? (top 8 by best score)

One dot per round; the bar spans each team's lowest to highest round. The ranking keeps the best round, so a bad run costs nothing.

Round 1 Round 2
I17 made the biggest jump of this event (+75 points, first round to last). 4 of the top 8 scored lower in their last round than their first — normal in robotics: battery, field placement and starting-position luck all vary run to run.

🧭 Why these charts (and not others)

  • Scatter for score-vs-time. Two continuous measures, one question: "are they related?" Only a scatter shows shape, outliers and the time-limit wall. A line chart would imply a time sequence that doesn't exist.
  • Dots on a bar for rounds. The job is before → after per team. Shades of one hue, distance = the change. A grouped bar works too but hides the direction at a glance.
  • Stat tiles for the headlines. Team counts, ranks and time-outs are single numbers — a tile says them louder than any one-bar chart could.
  • A table for precision. Exact times to two decimals (places can be decided by hundredths of a second) belong in a table, where every value is also reachable without color or hover.
  • No pie charts. Scores are not parts of a whole — dozens of team scores as pie slices would compare angles nobody can judge. Pies only fit true part-to-whole splits with ≤ 6 segments.
  • One axis per chart. Score and time never share a plot on two different y-scales — that invents correlations. They meet honestly in the scatter, where each owns one axis.
📋 Full data table — 8 teams, every round
#TeamSchoolR1 ptsR1 sR2 ptsR2 sBest ptsBest s
1 I17 SMK RAJA SAKTI 71 95.78 146 99.81 146 99.81
2 I12 SMK SUNGAI PINANG 141 93.90 81 91.79 141 93.90
3 I16 SMK RAJA SAKTI 94 77.46 69 56.69 94 77.46
4 I15 SMK RAJA SAKTI 84 93.78 71 73.47 84 93.78
5 I08 SMK TENGKU BENDAHARA 44 58.82 79 82.79 79 82.79
6 I14 SMK SERI INTAN 44 46.84 49 70.60 49 70.60
7 I13 SMK SERI INTAN 20 25.75 34 22.78 34 22.78
8 I07 SMK BUKIT JAWA 30 48.03 28 21.91 30 48.03