NRC 2026

NRC 2025 · Ranking analysis · Analisis kedudukan

📊 RoboMission Rookie (Lower) · Negeri Sembilan

What the numbers from NEGERI SEMBILAN actually say: score vs time, round-to-round improvement, and why the fastest robot is not always the winning robot.

Data snapshot: 17 Sep 2025 15:50:48 · source: nrc.sasbadi.com
Full results →
Teams
6
Negeri Sembilan
Median score
64
top score 79
Maxed 120 s
0
of 6 robots
Rounds
2
best one counts

Score vs Time — is faster better?

Every dot is one team's best run: how many points it scored (↑) and how long it took (→). A scatter plot is the right form here because both values are continuous and the question is about their relationship.

teams
Only 6 teams — too few for a meaningful correlation, so there is no trend line here. All states together gives a bigger picture.

⏱️ Best time ≠ best ranking

Ranking rule: teams are sorted by score first; equal scores go to the higher total of all rounds, then to the faster time.

🥇 The fastest robot — I25, done in 13.03 s — finished rank #6 of 6 with 34 points. The #1 team (I24) took 75.07 s — 5.8× as long — but scored 79.

Places decided between equal scores (top 10):

  • #3 I35 over I26 — both best runs scored 64; decided by the total of all rounds (+29 points)
Fastest 5Time (s)ScoreActual rank
I25 13.03 34 #6 / 6
I36 56.34 69 #2 / 6
I26 57.66 64 #4 / 6
I35 69.84 64 #3 / 6
I24 75.07 79 #1 / 6

Round by round — who improved? (top 6 by best score)

One dot per round; the bar spans each team's lowest to highest round. The ranking keeps the best round, so a bad run costs nothing.

Round 1 Round 2
I26 made the biggest jump of this event (+29 points, first round to last). 2 of the top 6 scored lower in their last round than their first — normal in robotics: battery, field placement and starting-position luck all vary run to run.

🧭 Why these charts (and not others)

  • Scatter for score-vs-time. Two continuous measures, one question: "are they related?" Only a scatter shows shape, outliers and the time-limit wall. A line chart would imply a time sequence that doesn't exist.
  • Dots on a bar for rounds. The job is before → after per team. Shades of one hue, distance = the change. A grouped bar works too but hides the direction at a glance.
  • Stat tiles for the headlines. Team counts, ranks and time-outs are single numbers — a tile says them louder than any one-bar chart could.
  • A table for precision. Exact times to two decimals (places can be decided by hundredths of a second) belong in a table, where every value is also reachable without color or hover.
  • No pie charts. Scores are not parts of a whole — dozens of team scores as pie slices would compare angles nobody can judge. Pies only fit true part-to-whole splits with ≤ 6 segments.
  • One axis per chart. Score and time never share a plot on two different y-scales — that invents correlations. They meet honestly in the scatter, where each owns one axis.
📋 Full data table — 6 teams, every round
#TeamSchoolR1 ptsR1 sR2 ptsR2 sBest ptsBest s
1 I24 SMK DATO' SEDIA RAJA 79 75.07 54 35.28 79 75.07
2 I36 SMK TUNKU BESAR BURHANUDDIN 54 63.93 69 56.34 69 56.34
3 I35 SMK DATO' SEDIA RAJA 64 69.84 64 72.25 64 69.84
4 I26 SMK (FELDA) SERI SENDAYAN 35 35.44 64 57.66 64 57.66
5 I23 SMK TUANKU ABDUL RAHMAN 44 88.71 39 50.60 44 88.71
6 I25 SMA PERSEKUTUAN (SMBP) 34 13.03 34 31.44 34 13.03