NRC 2026

NRC 2024 · Ranking analysis · Analisis kedudukan

📊 RoboMission Rookie (Lower) · WP Putrajaya

What the numbers from WP Putrajaya actually say: score vs time, round-to-round improvement, and why the fastest robot is not always the winning robot.

Data snapshot: 05 Feb 2025 11:37:09 · source: nrc.sasbadi.com
Full results →
Teams
8
WP Putrajaya
Median score
43.5
top score 85
Used the full 120 s
0
of 8 robots
Rounds
2
best one counts

Score vs Time — is faster better?

Every dot is one team's best run: how many points it scored (↑) and how long it took (→). A scatter plot is the right form here because both values are continuous and the question is about their relationship.

+0.78
Correlation r · all 8 teams
strong positive — higher scores take longer · small sample
teams trend, finishers only
How to read it: every robot finished inside the clock. Across all teams the relationship is strong positive — higher scores take longer. Speed alone wins nothing — mission points do.

⏱️ Best time ≠ best ranking

Ranking rule: teams are sorted by score first; equal scores go to the higher total of all rounds, then to the faster time.

🥇 The fastest robot — I51, done in 4.00 s — finished rank #8 of 8 with 0 points. The #1 team (I54) took 66.00 s — 16.5× as long — but scored 85.

No place in the top 10 was decided between equal scores.

Fastest 5Time (s)ScoreActual rank
I51 4.00 0 #8 / 8
I53 28.00 37 #6 / 8
I59 43.00 40 #5 / 8
I58 62.00 35 #7 / 8
I54 66.00 85 #1 / 8

Round by round — who improved? (top 8 by best score)

One dot per round; the bar spans each team's lowest to highest round. The ranking keeps the best round, so a bad run costs nothing.

Round 1 Round 2
I55 made the biggest jump of this event (+33 points, first round to last). 3 of the top 8 scored lower in their last round than their first — normal in robotics: battery, field placement and starting-position luck all vary run to run.

🧭 Why these charts (and not others)

  • Scatter for score-vs-time. Two continuous measures, one question: "are they related?" Only a scatter shows shape, outliers and the time-limit wall. A line chart would imply a time sequence that doesn't exist.
  • Dots on a bar for rounds. The job is before → after per team. Shades of one hue, distance = the change. A grouped bar works too but hides the direction at a glance.
  • Stat tiles for the headlines. Team counts, ranks and time-outs are single numbers — a tile says them louder than any one-bar chart could.
  • A table for precision. Exact times to two decimals (places can be decided by hundredths of a second) belong in a table, where every value is also reachable without color or hover.
  • No pie charts. Scores are not parts of a whole — dozens of team scores as pie slices would compare angles nobody can judge. Pies only fit true part-to-whole splits with ≤ 6 segments.
  • One axis per chart. Score and time never share a plot on two different y-scales — that invents correlations. They meet honestly in the scatter, where each owns one axis.
📋 Full data table — 8 teams, every round
#TeamSchoolR1 ptsR1 sR2 ptsR2 sBest ptsBest s
1 I54 SMK PUTRAJAYA PRESINT 9(1) 85 66.00 66 67.00 85 66.00
2 I52 SMK PUTRAJAYA PRESINT 11(2) 68 83.00 80 85.00 80 85.00
3 I55 SMK PUTRAJAYA PRESINT 9(1) 44 57.00 77 87.00 77 87.00
4 I50 SMK PUTRAJAYA PRESINT 18(1) 43 91.00 47 93.00 47 93.00
5 I59 SMK PUTRAJAYA PRESINT 18(1) 39 88.00 40 43.00 40 43.00
6 I53 SMK PUTRAJAYA PRESINT 11(2) 37 28.00 34 28.00 37 28.00
7 I58 SMK PUTRAJAYA PRESINT 18(1) 35 62.00 26 57.00 35 62.00
8 I51 SMK PUTRAJAYA PRESINT 11(2) 0 4.00 0 13.00 0 4.00