NRC 2026

NRC 2025 · Ranking analysis · Analisis kedudukan

📊 RoboMission Pro (Primary) · Kelantan

What the numbers from KELANTAN actually say: score vs time, round-to-round improvement, and why the fastest robot is not always the winning robot.

Data snapshot: 17 Sep 2025 15:48:11 · source: nrc.sasbadi.com
Full results →
Teams
7
Kelantan
Median score
50
top score 155
Maxed 120 s
2
of 7 robots
Rounds
2
best one counts

Score vs Time — is faster better?

Every dot is one team's best run: how many points it scored (↑) and how long it took (→). A scatter plot is the right form here because both values are continuous and the question is about their relationship.

teams
Only 7 teams — too few for a meaningful correlation, so there is no trend line here. All states together gives a bigger picture.

⏱️ Best time ≠ best ranking

Ranking rule: teams are sorted by score first; equal scores go to the higher total of all rounds, then to the faster time.

🥇 The fastest robot — A01, done in 35.72 s — finished rank #5 of 7 with 50 points. The #1 team (A02) took 66.47 s — 1.9× as long — but scored 155.

Places decided between equal scores (top 10):

  • #4 A05 over A01 — both best runs scored 50; decided by the total of all rounds (+15 points)
Fastest 5Time (s)ScoreActual rank
A01 35.72 50 #5 / 7
A05 43.12 50 #4 / 7
A02 66.47 155 #1 / 7
A03 77.72 150 #2 / 7
A04 105.59 100 #3 / 7

Round by round — who improved? (top 7 by best score)

One dot per round; the bar spans each team's lowest to highest round. The ranking keeps the best round, so a bad run costs nothing.

Round 1 Round 2
A04 made the biggest jump of this event (+80 points, first round to last). 2 of the top 7 scored lower in their last round than their first — normal in robotics: battery, field placement and starting-position luck all vary run to run.

🧭 Why these charts (and not others)

  • Scatter for score-vs-time. Two continuous measures, one question: "are they related?" Only a scatter shows shape, outliers and the time-limit wall. A line chart would imply a time sequence that doesn't exist.
  • Dots on a bar for rounds. The job is before → after per team. Shades of one hue, distance = the change. A grouped bar works too but hides the direction at a glance.
  • Stat tiles for the headlines. Team counts, ranks and time-outs are single numbers — a tile says them louder than any one-bar chart could.
  • A table for precision. Exact times to two decimals (places can be decided by hundredths of a second) belong in a table, where every value is also reachable without color or hover.
  • No pie charts. Scores are not parts of a whole — dozens of team scores as pie slices would compare angles nobody can judge. Pies only fit true part-to-whole splits with ≤ 6 segments.
  • One axis per chart. Score and time never share a plot on two different y-scales — that invents correlations. They meet honestly in the scatter, where each owns one axis.
📋 Full data table — 7 teams, every round
#TeamSchoolR1 ptsR1 sR2 ptsR2 sBest ptsBest s
1 A02 SJKC CHUNG HWA 155 66.47 50 29.68 155 66.47
2 A03 SJKC CHUNG HWA 150 77.72 20 120.00 150 77.72
3 A04 SK KUBANG KERIAN (2) 20 120.00 100 105.59 100 105.59
4 A05 SK MEKASAR 35 105.13 50 43.12 50 43.12
5 A01 SJKC CHUNG HWA 20 120.00 50 35.72 50 35.72
6 A07 SK BUKIT JAWA 20 120.00 20 120.00 20 120.00
7 A06 SK MEKASAR 15 120.00 15 120.00 15 120.00