NRC 2026

NRC 2026 · Ranking analysis · Analisis kedudukan

📊 RoboMission Pro (Lower) · Kelantan

What the numbers from 02. NRC Kelantan 2026 actually say: score vs time, round-to-round improvement, and why the fastest robot is not always the winning robot.

Data snapshot: 12 Sep 2026 10:28:43 · source: nrc.sasbadi.com
Full results →
Teams
5
Kelantan
Median score
40
top score 52
Maxed 120 s
0
of 5 robots
Rounds
2
best one counts

Score vs Time — is faster better?

Every dot is one team's best run: how many points it scored (↑) and how long it took (→). A scatter plot is the right form here because both values are continuous and the question is about their relationship.

teams
Only 5 teams — too few for a meaningful correlation, so there is no trend line here. All states together gives a bigger picture.

⏱️ Best time ≠ best ranking

Ranking rule: teams are sorted by score first; equal scores go to the higher total of all rounds, then to the faster time.

🥇 The fastest robot — B24, done in 12.25 s — finished rank #4 of 5 with 36 points. The #1 team (B25) took 38.62 s — 3.2× as long — but scored 52.

Places decided between equal scores (top 10):

  • #2 B22 over B23 — both best runs scored 40; decided by time, 25.31 s faster
Fastest 5Time (s)ScoreActual rank
B24 12.25 36 #4 / 5
B22 30.75 40 #2 / 5
B25 38.62 52 #1 / 5
B26 50.03 35 #5 / 5
B23 56.06 40 #3 / 5

Round by round — who improved? (top 5 by best score)

One dot per round; the bar spans each team's lowest to highest round. The ranking keeps the best round, so a bad run costs nothing.

Round 1 Round 2
B22 made the biggest jump of this event (+10 points, first round to last). 2 of the top 5 scored lower in their last round than their first — normal in robotics: battery, field placement and starting-position luck all vary run to run.

🧭 Why these charts (and not others)

  • Scatter for score-vs-time. Two continuous measures, one question: "are they related?" Only a scatter shows shape, outliers and the time-limit wall. A line chart would imply a time sequence that doesn't exist.
  • Dots on a bar for rounds. The job is before → after per team. Shades of one hue, distance = the change. A grouped bar works too but hides the direction at a glance.
  • Stat tiles for the headlines. Team counts, ranks and time-outs are single numbers — a tile says them louder than any one-bar chart could.
  • A table for precision. Exact times to two decimals (places can be decided by hundredths of a second) belong in a table, where every value is also reachable without color or hover.
  • No pie charts. Scores are not parts of a whole — dozens of team scores as pie slices would compare angles nobody can judge. Pies only fit true part-to-whole splits with ≤ 6 segments.
  • One axis per chart. Score and time never share a plot on two different y-scales — that invents correlations. They meet honestly in the scatter, where each owns one axis.
📋 Full data table — 5 teams, every round
#TeamSchoolR1 ptsR1 sR2 ptsR2 sBest ptsBest s
1 B25 SMK DATO' MAHMUD PADUKA RAJA (1) 52 38.62 24 28.61 52 38.62
2 B22 SMK KADOK 30 120.00 40 30.75 40 30.75
3 B23 SMK KUBANG BEMBAN 30 120.00 40 56.06 40 56.06
4 B24 SMK KUBANG BEMBAN 30 120.00 36 12.25 36 12.25
5 B26 SMK DATO' MAHMUD PADUKA RAJA (1) 35 50.03 22 37.88 35 50.03