NRC 2026 · Ranking analysis · Analisis kedudukan
📊 RoboMission Pro (Lower) · Pahang
What the numbers from 13. NRC Pahang 2026 actually say: score vs time, round-to-round improvement, and why the fastest robot is not always the winning robot.
Data snapshot: 12 Sep 2026 10:28:45 · source: nrc.sasbadi.comScore vs Time — is faster better?
Every dot is one team's best run: how many points it scored (↑) and how long it took (→). A scatter plot is the right form here because both values are continuous and the question is about their relationship.
⏱️ Best time ≠ best ranking
Ranking rule: teams are sorted by score first; equal scores go to the higher total of all rounds, then to the faster time.
🥇 The fastest robot — B51, done in 40.81 s — finished
rank #4 of 5 with 56 points. The #1 team
(B49) took 109.38 s — 2.7× as long — but scored 150.
No place in the top 10 was decided between equal scores.
| Fastest 5 | Time (s) | Score | Actual rank |
|---|---|---|---|
| B51 | 40.81 | 56 | #4 / 5 |
| B47 | 68.82 | 72 | #3 / 5 |
| B49 | 109.38 | 150 | #1 / 5 |
| B50 | 114.53 | 86 | #2 / 5 |
| B48 | 120.00 | 30 | #5 / 5 |
Round by round — who improved? (top 5 by best score)
One dot per round; the bar spans each team's lowest to highest round. The ranking keeps the best round, so a bad run costs nothing.
🧭 Why these charts (and not others)
- Scatter for score-vs-time. Two continuous measures, one question: "are they related?" Only a scatter shows shape, outliers and the time-limit wall. A line chart would imply a time sequence that doesn't exist.
- Dots on a bar for rounds. The job is before → after per team. Shades of one hue, distance = the change. A grouped bar works too but hides the direction at a glance.
- Stat tiles for the headlines. Team counts, ranks and time-outs are single numbers — a tile says them louder than any one-bar chart could.
- A table for precision. Exact times to two decimals (places can be decided by hundredths of a second) belong in a table, where every value is also reachable without color or hover.
- No pie charts. Scores are not parts of a whole — dozens of team scores as pie slices would compare angles nobody can judge. Pies only fit true part-to-whole splits with ≤ 6 segments.
- One axis per chart. Score and time never share a plot on two different y-scales — that invents correlations. They meet honestly in the scatter, where each owns one axis.
📋 Full data table — 5 teams, every round
| # | Team | School | R1 pts | R1 s | R2 pts | R2 s | Best pts | Best s |
|---|---|---|---|---|---|---|---|---|
| 1 | B49 | SMK SULTAN AHMAD SHAH | 150 | 109.38 | 140 | 109.37 | 150 | 109.38 |
| 2 | B50 | SMK BUKIT GOH | 84 | 107.46 | 86 | 114.53 | 86 | 114.53 |
| 3 | B47 | SMK SULTAN AHMAD SHAH | 72 | 68.82 | 30 | 120.00 | 72 | 68.82 |
| 4 | B51 | SMK BUKIT GOH | 54 | 35.96 | 56 | 40.81 | 56 | 40.81 |
| 5 | B48 | SMK SULTAN AHMAD SHAH | 20 | 21.53 | 30 | 120.00 | 30 | 120.00 |