NRC 2026

NRC 2024 · Ranking analysis · Analisis kedudukan

📊 RoboMission Pro (Upper) · Kelantan

What the numbers from Kelantan actually say: score vs time, round-to-round improvement, and why the fastest robot is not always the winning robot.

Data snapshot: 05 Feb 2025 11:35:26 · source: nrc.sasbadi.com
Full results →
Teams
7
Kelantan
Median score
21
top score 43
Maxed 120 s
0
of 7 robots
Rounds
2
best one counts

Score vs Time — is faster better?

Every dot is one team's best run: how many points it scored (↑) and how long it took (→). A scatter plot is the right form here because both values are continuous and the question is about their relationship.

teams
Only 7 teams — too few for a meaningful correlation, so there is no trend line here. All states together gives a bigger picture.

⏱️ Best time ≠ best ranking

Ranking rule: teams are sorted by score first; equal scores go to the higher total of all rounds, then to the faster time.

🥇 The fastest robot — C29, done in 10.00 s — finished rank #3 of 7 with 25 points. The #1 team (C35) took 70.00 s — 7.0× as long — but scored 43.

Places decided between equal scores (top 10):

  • #4 C34 over C32 — both best runs scored 21; decided by time, 2.00 s faster
  • #5 C32 over C30 — both best runs scored 21; decided by time, 2.00 s faster
  • #6 C30 over C31 — both best runs scored 21; decided by time, 1.00 s faster
Fastest 5Time (s)ScoreActual rank
C29 10.00 25 #3 / 7
C34 20.00 21 #4 / 7
C32 22.00 21 #5 / 7
C30 24.00 21 #6 / 7
C31 25.00 21 #7 / 7

Round by round — who improved? (top 7 by best score)

One dot per round; the bar spans each team's lowest to highest round. The ranking keeps the best round, so a bad run costs nothing.

Round 1 Round 2
C35 made the biggest jump of this event (+22 points, first round to last). 1 of the top 7 scored lower in their last round than their first — normal in robotics: battery, field placement and starting-position luck all vary run to run.

🧭 Why these charts (and not others)

  • Scatter for score-vs-time. Two continuous measures, one question: "are they related?" Only a scatter shows shape, outliers and the time-limit wall. A line chart would imply a time sequence that doesn't exist.
  • Dots on a bar for rounds. The job is before → after per team. Shades of one hue, distance = the change. A grouped bar works too but hides the direction at a glance.
  • Stat tiles for the headlines. Team counts, ranks and time-outs are single numbers — a tile says them louder than any one-bar chart could.
  • A table for precision. Exact times to two decimals (places can be decided by hundredths of a second) belong in a table, where every value is also reachable without color or hover.
  • No pie charts. Scores are not parts of a whole — dozens of team scores as pie slices would compare angles nobody can judge. Pies only fit true part-to-whole splits with ≤ 6 segments.
  • One axis per chart. Score and time never share a plot on two different y-scales — that invents correlations. They meet honestly in the scatter, where each owns one axis.
📋 Full data table — 7 teams, every round
#TeamSchoolR1 ptsR1 sR2 ptsR2 sBest ptsBest s
1 C35 KOLEJ VOKASIONAL PENGKALAN CHEPA 21 53.00 43 70.00 43 70.00
2 C33 SMK TENGKU INDRA PETRA 31 34.00 34 40.00 34 40.00
3 C29 SMK KUBANG BEMBAN 25 10.00 20 21.00 25 10.00
4 C34 KOLEJ VOKASIONAL PENGKALAN CHEPA 21 20.00 21 26.00 21 20.00
5 C32 SMK TENGKU INDRA PETRA 21 22.00 21 29.00 21 22.00
6 C30 SMK TENGKU BENDAHARA 21 24.00 21 24.00 21 24.00
7 C31 SMK BUKIT JAWA 21 25.00 21 28.00 21 25.00